Construction Milestones
Equipment Roster (Port 8080)
Work Orders
HUMAN RESOURCES:
Employment Opportunities
Roster of Enginemen
MAPS:
System Map
Philadelphia Division
Middle Division
Pittsburgh Division
PROCUREMENT:
RFP's
Purchase Orders
INVESTOR RELATIONS:
Stockholders
MISC.:
Diner Needs
Harrisburg Industries
Prototype References
Ops Primer
YORK HAVEN SHOPS:
Introduction
Heavyweight Sleepers - paint, letter 15 cars
EMD F3 Phase II - kitbash, paint, letter 11 locomotives
B60b Baggage Cars - build, paint, letter 28 cars
P70k, P70gs, PLC70 - kitbash, paint, letter 9 cars
BM70k Baggage/Mail Cars - build, paint, letter 3 cars
"HARRISBURG" - kitbash, paint, letter business car
|
|
Construction Milestones
- November 7, 2007
- Pittsburgh Division from Kittanning Point through Allegrippus operational.
- June 16, 2007
- Middle Division from BANKS to Aqueduct operational. The operating portion of the layout is now connected west through to Allegrippus Curve, which was built long ago.
- June 8, 2007
- Helix Three from Level IIb to Level III operational.
- October 19, 2006
- Philadelphia Division from ROCKVILLE (west half) to BANKS operational.
- March 16, 2006
- East End Staging renamed DREW Staging and West End Staging renamed ASH Staging, for clarity for crew.
- January 4, 2006
- 7th Street switching area operational.
- November 16, 2005
- Market Street switching area operational.
- November 9, 2005
- First operating session! Mainly for testing purposes... CTC and radios were used and nine trains were run over 90 minutes. Jeff Warner was the dispatcher.
- November 2, 2005
- Philadelphia Division and Pittsburgh/Middle Division CTC panels placed in service; Yardmaster CTC retired.
- May 22, 2005
- First public open house -- For the PRRT&HS annual meeting. Attendance estimated at 40; 31 signed guest book.
- May 6, 2005
- Yardmaster CTC in service.
- May 4, 2005
- "Silver Spike" installed! The Eastern Region now has a continuous run via the Susquehanna Division between Rockville and West End Staging.
- April 20, 2005
- Philadelphia Division, ROCKVILLE (east half) operational. Sets up "silver spike" ceremony with first continuous run route.
- April 20, 2005
- Helix Four from Level IIa to Level IIb operational.
- March 17, 2005
- Lucknow Switching Area operational.
- February 19, 2005
- Helix Three from Level I to Level IIb operational.
- February 12, 2005
- Recovery from 7/31/04 and 9/17/04 floods is finally complete (major rewiring).
- December 29, 2004
- Philadelphia Division main lines operational from Harrisburg Station to Lucknow.
- December 26, 2004
- Crew's Lounge ready for occupancy.
- November 17, 2004
- West End Staging operational.
- October 25, 2004
- JMRI & Panel Pro selected as system for computerized dispatching.
- October 20, 2004
- Layout work resumes, even though crew's lounge is not quite completed.
- September 17-18, 2004
- Hurricane Ivan resulted in 18" of water in the basement. It barely remained below layout level. The sump pump was replaced with one twice as powerful and designed to be submerged.
- August 1, 2004
- 9-10 inches of rain in 5-6 hours results in 15" of water in the basement. It remained below layout level, and the homasote developed zero problems! However, several transformers and electronics boards were submerged. Layout work is suspended until the office is rebuilt and crew's lounge completed.
- September 17, 2003
- East End Staging operational.
- August 7, 2003
- Philadelphia Division main lines operational from Helix One through Harrisburg passenger station.
Very limited operations now possible!
- June 22, 2003
- Logic Rail Technologies LocoNet Fast Clock installed and tested.
- March 27, 2003
- Digitrax MS-100 installed and tested on East Dispatcher system.
- March 19, 2003
- Helix Two operational.
- December 20, 2002
- Maxon HX-49 five-channel headset radios adopted as standard. 8/5/03: These radios have been discontinued and are not being replaced. The frequency is being abandoned in favor of the FRS bands. A replacement standard will follow.
- November 13, 2002
- Computer system installed in office. This will house the East Dispatcher.
- October 30, 2002
- Helix One operational.
- March 20, 2002
- First locomotive run on permanently installed track and wiring! Reading #802 run on staging reverse loop.
- January 21, 2002
- Atlas Code 55 track finally received!!!
- December 2, 2001
- Digitrax DCS100 command station and UR91 radio receiver installed and brought online.
- November 23, 2001
- With Atlas Code 55's arrival imminent, construction of benchwork begins!
- September 10 - November 22, 2001
- HOLD pending release of Atlas' new line of Code 55 track, originally scheduled for September release, but delayed until at least late November.
- September 10, 2001
- Room painted and completed! (photos)
- August 14, 2001
- Electrical completed, including dedicated circuit to DCC equipment.
- August 4, 2001
- Drywalling completed.
- January 1 - July 25, 2001
- Work paused. I had two herniated disks in my lower back which kept me off of construction work. Several months of physical therapy returned me to constructive capacity, but in a cautious state!
- December 28, 2000
- Insulated new wall frames.
- December 27, 2000
- Roughed-in dedicated electrical service for model railroad systems.
- December 26, 2000
- Roughed-in electric service and heat within new wall frames.
- June 3, 2000
- Completed framing of new north wall containing recessed electronics alcove for adjoining rec room. Completed framing of new east wall, with door, adjoining rec room. (photos)
- June 2, 2000
- Tear down existing walls defining storage room.
|
|