HOME

Blog

PUBLIC RELATIONS:
Time & Place
Tour of Locations
Photos (Port 8080)
Web Cam
Bibliography
Mailing List

OPERATIONS:
Public Timetable
Employee Timetable
Book of Rules
Makeup of Trains
Arranged Freight Service
Other Trains
CT1000
Interchange Points

OFFICE OF THE
CHIEF ENGINEER:

Givens & Druthers
Standards
Materials
Layout Design
Construction Milestones
Equipment Roster (Port 8080)
Work Orders

HUMAN RESOURCES:
Employment Opportunities
Roster of Enginemen

MAPS:
System Map
Philadelphia Division
Middle Division
Pittsburgh Division

PROCUREMENT:
RFP's
Purchase Orders

INVESTOR RELATIONS:
Stockholders

MISC.:
Diner Needs
Harrisburg Industries
Prototype References
Ops Primer

YORK HAVEN SHOPS:
Introduction
Heavyweight Sleepers - paint, letter 15 cars
EMD F3 Phase II - kitbash, paint, letter 11 locomotives
B60b Baggage Cars - build, paint, letter 28 cars
P70k, P70gs, PLC70 - kitbash, paint, letter 9 cars
BM70k Baggage/Mail Cars - build, paint, letter 3 cars
"HARRISBURG" - kitbash, paint, letter business car

Construction Milestones

November 7, 2007
Pittsburgh Division from Kittanning Point through Allegrippus operational.

June 16, 2007
Middle Division from BANKS to Aqueduct operational. The operating portion of the layout is now connected west through to Allegrippus Curve, which was built long ago.

June 8, 2007
Helix Three from Level IIb to Level III operational.

October 19, 2006
Philadelphia Division from ROCKVILLE (west half) to BANKS operational.

March 16, 2006
East End Staging renamed DREW Staging and West End Staging renamed ASH Staging, for clarity for crew.

January 4, 2006
7th Street switching area operational.

November 16, 2005
Market Street switching area operational.

November 9, 2005
First operating session! Mainly for testing purposes... CTC and radios were used and nine trains were run over 90 minutes. Jeff Warner was the dispatcher.

November 2, 2005
Philadelphia Division and Pittsburgh/Middle Division CTC panels placed in service; Yardmaster CTC retired.

May 22, 2005
First public open house -- For the PRRT&HS annual meeting. Attendance estimated at 40; 31 signed guest book.

May 6, 2005
Yardmaster CTC in service.

May 4, 2005
"Silver Spike" installed! The Eastern Region now has a continuous run via the Susquehanna Division between Rockville and West End Staging.

April 20, 2005
Philadelphia Division, ROCKVILLE (east half) operational. Sets up "silver spike" ceremony with first continuous run route.

April 20, 2005
Helix Four from Level IIa to Level IIb operational.

March 17, 2005
Lucknow Switching Area operational.

February 19, 2005
Helix Three from Level I to Level IIb operational.

February 12, 2005
Recovery from 7/31/04 and 9/17/04 floods is finally complete (major rewiring).

December 29, 2004
Philadelphia Division main lines operational from Harrisburg Station to Lucknow.

December 26, 2004
Crew's Lounge ready for occupancy.

November 17, 2004
West End Staging operational.

October 25, 2004
JMRI & Panel Pro selected as system for computerized dispatching.

October 20, 2004
Layout work resumes, even though crew's lounge is not quite completed.

September 17-18, 2004
Hurricane Ivan resulted in 18" of water in the basement. It barely remained below layout level. The sump pump was replaced with one twice as powerful and designed to be submerged.

August 1, 2004
9-10 inches of rain in 5-6 hours results in 15" of water in the basement. It remained below layout level, and the homasote developed zero problems! However, several transformers and electronics boards were submerged. Layout work is suspended until the office is rebuilt and crew's lounge completed.

September 17, 2003
East End Staging operational.

August 7, 2003
Philadelphia Division main lines operational from Helix One through Harrisburg passenger station.
Very limited operations now possible!

June 22, 2003
Logic Rail Technologies LocoNet Fast Clock installed and tested.

March 27, 2003
Digitrax MS-100 installed and tested on East Dispatcher system.

March 19, 2003
Helix Two operational.

December 20, 2002
Maxon HX-49 five-channel headset radios adopted as standard. 8/5/03: These radios have been discontinued and are not being replaced. The frequency is being abandoned in favor of the FRS bands. A replacement standard will follow.

November 13, 2002
Computer system installed in office. This will house the East Dispatcher.

October 30, 2002
Helix One operational.

March 20, 2002
First locomotive run on permanently installed track and wiring! Reading #802 run on staging reverse loop.

January 21, 2002
Atlas Code 55 track finally received!!!

December 2, 2001
Digitrax DCS100 command station and UR91 radio receiver installed and brought online.

November 23, 2001
With Atlas Code 55's arrival imminent, construction of benchwork begins!

September 10 - November 22, 2001
HOLD pending release of Atlas' new line of Code 55 track, originally scheduled for September release, but delayed until at least late November.

September 10, 2001
Room painted and completed! (photos)

August 14, 2001
Electrical completed, including dedicated circuit to DCC equipment.

August 4, 2001
Drywalling completed.

January 1 - July 25, 2001
Work paused. I had two herniated disks in my lower back which kept me off of construction work. Several months of physical therapy returned me to constructive capacity, but in a cautious state!

December 28, 2000
Insulated new wall frames.

December 27, 2000
Roughed-in dedicated electrical service for model railroad systems.

December 26, 2000
Roughed-in electric service and heat within new wall frames.

June 3, 2000
Completed framing of new north wall containing recessed electronics alcove for adjoining rec room. Completed framing of new east wall, with door, adjoining rec room. (photos)

June 2, 2000
Tear down existing walls defining storage room.