Home

DREW Staging

Helix to Middle Level

Philadelphia Division:

Lemoyne

Harrisburg

ROCKVILLE

Marysville

BANKS

Middle Division:

Cove

VIEW

Duncannon

Helix to Upper Level

Pittsburgh Division:

Kittaning Point

Horseshoe Curve

MG

The Allegripus

Bennington Curve / BF

SF

Tunnel Hill / Gallitzin

AR / UN

MO

Cresson

Helix to Lower Level

ASH Staging

Previous | Home |Next


Prototype BF / SF/ UN / AR Interlocking Diagram

The two double mains are separated enough that they indeed have separate exits from the mountain at Gallitzin. AR and UN towers exist here, as well as the eastbound and westbound passenger stations. The helper loop tracks between the two the diesel helper facility as it existed at the time, prior to its movement to Cresson later in the decade.

The tracks converge back to a four-track main as they pass under the Route 53 bridge.

Published Photos

Westbound signal bridge, AR, diesel facility, 1956. "Heart of the Pennsylvania Railroad", p. 103.

Eastbound signal bridge, AR, 1956. "Heart of the Pennsylvania Railroad", p. 104.

Color shot of AR tower, 1995. "Triumph I", p. 354.

Needed: Closeup photos of UN tower, AR tower, eastbound and westbound passenger stations, diesel facilities on loop track, including dimensional data, and valuation map of area.

Previous | Home |Next

Copyright 1996 - 2008

Last modified: November 25 2007.

Keystone Crossings has served 4900334 pages since June 1, 1997.