Print

While it's been a while since my last update, a lot has been going on. I've been mired down with selling off all of the paper from the spring acquisition. Though it's kept me off the model railroad, it's provided welcome revenue for projects moving forward.

I started plastering the mountains in the Manns Narrows area. Though the results are acceptable, it has proven quite time consuming. I can only cover about two square feet with one batch of plaster, which has a working time of 6-8 minutes. Unfortunately, I have to crawl under a portion of the benchwork to get to the mountain area. This is proving to be a tiring process. It is probably more conducive to being a two person project -- one in the hole plastering and the other cleaning out the mixing pan between batches.

Today I managed to mount all 17 switch machines in the Yeagertown area. I also formulated the design plan for the fascia-mounted control panels. I have 6 more track power drops and 2 frog power drops to implement yet, then this area will be ready for the fascia.

I've also redesigned the web site a bit, making it more representative of a real railroad. Enjoy!