Blog entries from August 2017 and earlier have been migrated from a former site and many of the images are incorrectly linked. These will be repaired over time.

First look at Phase I benchwork. The lower level will be Lewistown Junction. The main will be on the left, looking west, and the yard on the right. The upper level will be Yeagertown, again looking west.

image not available

I "broke ground" last evening. Let's call this "Phase I".

Phase I entails construction of the model railroad in the former N scale trainroom. It is 10' x 24' plus an 8' x 8' forming an "L" shape.

The main level will feature the main line from just east of the Lewistown Junction station to just east of LEWIS interlocking. It will also feature the Lewistown Junction yard, which includes a turntable and locomotive facility.

The upper level will feature the Milroy Secondary from the very east end of Burnham, through Yeagertown and Lower Mann, through the first part of Mann's Narrows. There are numerous industries along this stretch, most notably Standard Steel.