PENNSYRR.COM by Jerry Britton

Jerry Britton's PRR Middle Division in HO Scale

The engineer in this position is provided a Sequence of Trains to move westward on track four. 

For a First Trick session, there are four westbound passenger trains, three of which have station stops at Lewistown. There is also a local freight that returns from Newport and terminates at Lewistown.

For a Second Trick session, there are eight westbound passenger trains. There is also a local freight that departs Lewistown for Mount Union.

For run each train, perform the following steps:

  1. Acquire the locomotive on the throttle.
  2. Proceed to and through LEWIS per signal indication, returning to staging, or into Lewistown Junction yard to terminate.
  3. Tie down your train by confirming the throttle speed is at zero, then dispatch the loco from your throttle.