It's been a great week for layout construction. Today I started mocking up the trackwork for Lewistown Junction, in the station area.
- Details
- Category: Engineering Blog
As a state employee, I always look forward to holidays for marathon work sessions, and Columbus Day was no different.
- Details
- Category: Engineering Blog
The Chief Engineer of the Middle Division has issued his third quarter construction report.
Highlights include completion of Mann's Narrows, operating status at KV Junction, and the completion of the helix between Lewistown Junction and Lewistown.
Projections over the next year include the east end of Burnham (Q4 2013), Lewistown Junction (Q1 2014), WALL (Q2 2014), and Enola/Harrisburg Staging (Q3 2014).
The Middle Divisions first open house will be for the Pennsylvania Railroad Technical & Historical Society (PRRT&HS) in May 2014.
You can view the full report of the Chief Engineer.
- Details
- Category: Engineering Blog
KV Junction, just east of Mann's Narrows, is now operational. The prototype is a triangular wye, just west of Reedsville, Pa., but that will be part of a later expansion.
- Details
- Category: Engineering Blog
The helix between Lewistown Junction and downtown Lewistown has been completed and made operational.
Heading east on the Lewistown Secondary, the line enters the helix just east of the scale house behind the Lewistown station -- at the bottom center on the above photo. The helix exits at upper left where it will come across the Juniata River into downtown Lewistown.
The helix was a kit from Ashlin Designs. Designed for two tracks, I needed only one, so the end result is an approximate 27" radius with a 2% grade. The kit went together easily and is sturdy and firm. This proved a very cost and time effective solution.
The helix is located directly below Mann's Narrows, which is why I had to finish the scenery in The Narrows before tackling this section.
- Details
- Category: Engineering Blog
Mann's Narrows, a gap through the mountains between Yeagertown and Reedsville, is now fully completed on the Milroy Secondary.
This is one area of the model railroad where I had to complete the scenery in short order prior to placing a helix below the area. It's taken about six months to build the mountains, pour a limestone stream, place ground cover, and plant a hundred or so trees.
- Details
- Category: Engineering Blog
Over the past few days I completed two track lighting projects. At right is a current view of Mann's Narrows. This is representative of how I plan to light the upper level during op sessions and open houses -- with the ceiling flourescent "house lights" off. Installation of the tracks was actually pretty easy. What took longer was wiring two new circuits into the breaker box.
Mann's Narrows still isn't done. My goal was April 30th, but spring happened. My self-imposed hard deadline is Q2 -- about two weeks away. It will be close, but I have completed a few tasks that I had on my timeline for Q3, so I guess it'll be a fair wash.
- Details
- Category: Engineering Blog
I've been getting a lot accomplished as the winter modeling season comes to a close. Since last time I have installed backdrops on the upper display level. I also finished installing the backdrop behind Yeagertown and Burnham.
I'm focusing on Mann's Narrows, with the goal of getting the area fully sceniced by the end of the month. The mountain has received a complement of trees and I have completed the plastering and some of the sculptamodling on the foreground scenery, including some trademark Pennsy retaining walls along the edge of the Kishocoquillas Creek.
- Details
- Category: Engineering Blog
I love President's Day... it's a holiday for me and I always plan on working on the model railroad. Spring is just around the corner and I am sprinting to complete several projects before the yard work comes a calling.
Since my last report, the mountain on the far side of the track received its final plaster coat and a
coat of Sculptamold. Plaster castings of rock outcroppings were applied and appropriately colored. A based coat of "dirt" paint was appied to all non-rock areas. The mountain is ready for a layer of "forest floor" and then comes tree planting time. Oops, gotta make the trees first!