Today the missing link -- the scale track at Lewistown -- was installed.
This short piece of track, including two gauntlet turnouts and a gauntlet track, were built on the workbench due to its location on the model railroad. It was part of my presentation for my Model Railroad Engineer - Civil AP from the NMRA.
This link is critical as it provides headroom at the east end of the Lewistown Yard and, more importantly, the connection to the Lewistown Secondary (and the Milroy Secondary beyond).
Up next: QC (quality control) at the east end of the yard, a good track cleaning, and then operations!