Blog
This blog is limited to articles; random photos or quick updates are posted to the FaceBook page.
Blog entries from August 2017 and earlier have been migrated from a former site and many of the images are incorrectly linked. These may be repaired over time.
- Details
- Category: Engineering Blog
Another holiday, another marathon work day on the PRR Middle Division in HO Scale!
First order of the day was to complete the subroadbed for the Lewistown yard. Also cut the remaining scenery liftouts for along Water Street in downtown Lewistown, as well as some bases for scenery in front of the station at Lewistown. You can see more photos on the PRR Middle Division in HO Scale's FaceBook page.
- Details
- Category: Public Relations Blog
The PRR Middle Division in HO Scale now has a FaceBook page...
Why? Because the web page is a "pull" system. Users have to go to the page and review it for updates.
FaceBook is a "push" system. Changes will appear in the feeds of those who have an interest and opt to follow the page.
Please visit the FaceBook page and Like and/or Follow it... https://www.facebook.com/prrmiddledivision/
- Details
- Category: Engineering Blog
As an employee of the state, MLK Day is a holiday, and every year I spend it in the train room. This year was no different, and my mission was to complete the riverbed and adjoining city block where the PRR's Lewistown Secondary crosses the Juniata River.
A challenge is that the riverbed is just three inches above the yard ladder for staging, so the track needs to remain accessible for maintenance. That said, it all needs to be removable. I had previously created the riverbed where the bridge itself will be located. It is removable via three screws, allowing the through girder bridge to remain as one piece.
- Details
- Category: Engineering Blog
The Lewistown (LN) segment of the PRR Middle Division in HO Scale is now operational.
The bridge from Lewistown (XA) (aka Lewistown Junction) across the Juniata River to downtown Lewistown has been completed and provides the missing link. The remainder of downtown "through" trackage was previously in place.
Over the next few weeks, the final ten feet or so of track between the south side of the bridge and the main line will be activated. At that point, all "through" trackage on the railroad will be complete and trains will be able to traverse from the main line all the way to Milroy at the end of the Milroy Secondary.
Two informal op sessions are already planned (but not yet announced) for the coming months, mostly to test out the line and determine where tuning work is required.
- Details
- Category: Engineering Blog
The Chief Engineer of the PRR Middle Division in HO Scaleis pleased to present its report of progress as of the end of fourth quarter 2016.
A goal for Q4 was to complete location Lewistown (LN), consisting of the Lewistown Secondary from the Juniata River to the junction of the Milroy Secondary and the Sunbury & Lewistown Secondary.
Subcategories
Public Relations Blog Article Count: 50
Engineering Blog Article Count: 99
Mechanical Department Blog Article Count: 14
Operations Blog Article Count: 6
Page 13 of 34