PENNSYRR.COM by Jerry Britton

The engineer in this position is provided a Sequence of Trains to move eastward on track two. 

For a First Trick session, there are eight scheduled eastbound freight trains, one of which have work at Lewistown. 

For a Second Trick session, there are six eastbound freight trains, one of which have work at Lewistown. 

Crews are encouraged to run eastbound coal trains, or second sections of scheduled trains, as extras as time allows.

For run each train, perform the following steps:

  1. Acquire the locomotive on the throttle.
  2. Proceed to and through LEWIS per signal indication, returning to staging, or into Lewistown Junction yard to terminate.
  3. Tie down your train by confirming the throttle speed is at zero, then dispatch the loco from your throttle.